Catherine
12M Lason steel plate pile 450 machine, about 80 roots a day, different from factors such as geological conditions and construction conditions, which are different.
The steel plate piles are divided into U -shaped, Z and AS types. Due to the production, processing and installation of AS -type steel plate piles more complicated, the price is about 1/3 higher than the U -shaped. At present It is mainly used in Europe, America, Japan and South Korea, etc. Asia mainly uses U -shaped steel piles. There are two types of U -shaped steel plate piles: one is the PU -shaped steel plate pile with a width of 600mm; elastic cross -sectional resistance is from 600 to 3200cm3/m; the reuse rate reaches 30 times; Strong durability; the second is AU -shaped steel plate pile with a width of 750mm and elastic section resistance from 1410 ~ 2580cm3/m; compared with PU -shaped steel plate piles, AU -shaped steel plate piles are thinner, lighter but stronger; Large, it is easy to pull out the piles from the soil.
12M Lason steel plate pile 450 machine, about 80 roots a day, different from factors such as geological conditions and construction conditions, which are different.
The steel plate piles are divided into U -shaped, Z and AS types. Due to the production, processing and installation of AS -type steel plate piles more complicated, the price is about 1/3 higher than the U -shaped. At present It is mainly used in Europe, America, Japan and South Korea, etc. Asia mainly uses U -shaped steel piles. There are two types of U -shaped steel plate piles: one is the PU -shaped steel plate pile with a width of 600mm; elastic cross -sectional resistance is from 600 to 3200cm3/m; the reuse rate reaches 30 times; Strong durability; the second is AU -shaped steel plate pile with a width of 750mm and elastic section resistance from 1410 ~ 2580cm3/m; compared with PU -shaped steel plate piles, AU -shaped steel plate piles are thinner, lighter but stronger; Large, it is easy to pull out the piles from the soil.
This is not fixed, there are many objective reasons in it, not necessarily.
The specific number is determined by the proficiency of the operator of the geological situation.